3DS-D1 Project,Kyusyu Sekiyu Ohita Refinery (3)

Ohita Prefecture,Aprile 4,1998



       


4.2 Clearance between the load and duct support column

was very tight during hoisting.

























4.3 The Reactor was rested on the foundation pad.