3DS-D1 Project,Kyusyu Sekiyu Ohita Refinery (1)

Offloading,Inland transportation and Erection work for a Reactor, which has

dimension of 4.5 meters diameter and 15.7 meters length and weighting 173-tons.

Ohita Prefecture,Aprile 4,1998


          



1. Off-loading

1.1 The Reactor was delivered at Otozu public port in Ohita

prefecture then furnished with lifting tackle hung from

floating crane's hook block.

















1.2 The floating crane which has 700-ton lifting capacity is now

ready for one-hour-voyage with the load to the off-loading

point at Kyusyu Sekiyu Refinery after hoisting up

the Reactor from the vessel.
















1.3 Under haulage by tugboat.














Go to next page