3DS-D1 Project,Kyusyu Sekiyu Ohita
Refinery (1)
Offloading,Inland transportation and Erection work for
a Reactor, which has
dimension of 4.5 meters diameter and 15.7 meters length and weighting 173-tons.
Ohita Prefecture,Aprile 4,1998
1. Off-loading
1.1 The Reactor was delivered at Otozu public port in Ohita
prefecture then furnished with lifting tackle hung from
floating crane's hook block.
1.2 The floating crane which has 700-ton lifting capacity
is now
ready for one-hour-voyage with the load to the off-loading
point at Kyusyu Sekiyu Refinery after hoisting up
the Reactor from the vessel.

1.3 Under haulage by tugboat.
Go to next page
、