X-3 Construction work at Mizushima

1.Sep.1997`30.Jun.1998



Derivery at the site
Lift the tower by two cranes.
450ton crawler crane lifted the head and 150ton crawler crane was used as a tail crane to erect the tower.














Erection
After the tower was in vertical.
The load was swung over the pipe rack to be brought to the final position.












Completion of the installation
Install the tower on the foundation after adjusting the bolt hole to anchor bolt.













Erection of the top section of the tower
Lift the top section after the completion of the welding work for the lower piece.